Apartments
- Apartments : 3
Room+Living Room | Bathroom | Square Meters | Price | Floor | Direction |
---|---|---|---|---|---|
1+1 | 1 | 50 m2 | 129.000 € | 4 | |
2+1 | 0 | 85 m2 | 184.000 € | 2 | |
2+1 | 0 | 105 m2 | 249.000 € | 5 |
Description
Light City Project in Kargicak Neighborhood;
It will be built on the old Gazipasa street road, 100 meters away from the sea and only 25 km from Gazipasa airport.
The technical and social features of Light City :
General Usage Area: 3000 M²
Number of Flats for sale: 53
General Information about Flats:
A Block 1+1 Apartments (15 units on the 2nd, 3rd, 4th Floor) 50 - 52 M², (1 Living Room, 1 Bedroom, 1 Bathroom Toilet, 1 Balcony)
A Block 2+1 Apartments (6 units on the 2nd, 3rd Floor) 85 M² ,(1 Living Room, 2 Bedrooms, 2 Bathrooms WC, 1 Balcony)
A Block 2+1 Duplex Apartments (5th Floor 5 Units) 105 M² ,( 1 Living Room, 2 Bedrooms, 2 Bathrooms, WC, 2 Balconies)
A Block 4+1 Dublex Apartments (5th Floor 2 Units) 175 M²,( 1 Living Room, 4 Bedrooms, 2 Bathrooms Toilet, 5 Balconies)
B Block 1+1 Apartments (20 Units on the 1st, 2nd, 3rd, 4th Floor) 50 – 52 M² , (1 Living Room, 1 Bedroom, 1 Bathroom Toilet, 1 Balcony)
B Block 2+1 Duplex Apartments (5th Floor 3 Units) 100 M²,( 1 Living Room, 1 Bedroom, 2 Bathrooms WC, 2 Balconies)
B Block 3+1 Duplex Apartments (5th Floor 2 Units) 130 M² ,( 1 Living Room, 3 Bedrooms, 3 Bathrooms WC, 4 Balcony)
Note: apartments will be delivered unfurnished.
Technical Facilities
Camera Security System
Doorman
Lift
Generator
Social area Landscape and Water walls
Air Conditioning System
3 Phase Electric Water Heating System Infrastructure
Electrical cable infrastructure suitable for Smart Home equipment
Telephone and Internet Line Infrastructure
Video Doorphone system
Kitchen Cabinets, Faucets and Shower Cabin
Outdoor pool
Indoor pool
Fitness and Step-Aerobics Hall
Sauna
Turkish Bath (Special)
SPA Center (Special)
Barbecue and Gazebo
Children's playground
Payment options
Payment plan is made 30% in advance and the rest will be 12 months installment.
Construction Schedule:
As of 01.10.2021, project will start and it will be over on 31 May 2023.