Apartments
- Apartments : 2
Room+Living Room | Bathroom | Square Meters | Price | Floor | Direction |
---|---|---|---|---|---|
1+1 | 1 | 65 m2 | 290.000 € | 2 | |
2+1 | 2 | 0 m2 | 395.000 € | 1 |
Description
The Seaside Premium complex is 25.000 M² under construction and consists of 8 blocks. An extraordinary sea view from the main windows of apartments and balconies will be mountain views.
The entire territory of the complex will be Sea View, with beautiful irrigated green lawn and ornamental trees.
The complex includes: 3 large pools, a hilltop pool, a pool with a relaxation area and 2 children's pools. Next to the pool there is a bar, a place for barbecue, a gazebo and a basketball court and large tennis courts.
There are indoor swimming pool, restaurant, Turkish bath , steam room, sauna, salt room, massage rooms, toilet, fitness center, Pilates yoga, Billiards, Table Tennis, movie theater, Dressing rooms and bathrooms.
Technical features: antibacterial facade, noise and water insulation, Spacious and modern elevator, Fire prevention alarm system, Central satellite systems, 24/7 cameras.
In apartments: steel doors, Video intercom. Spot lighting. Washable paint on walls and floors in premium granite, Porcelains, ceramics and design are enhanced by kitchens and bathrooms. Air conditioners in all rooms, home phone number and double glazed Italian PVC windows .
The complex is located on the first coastline of the Mediterranean.
It is 15 km from Alanya city center.
Gazipasa airport is 15 km away and only 25 meters to the sea.
Blocks A, B, C, D, E, F, G 350 Flats:
Apt 126 (1 + 1 65-70 M²)
Apt 84 (2+1 90-115 M²)
Apt 42 (135-160 M² 2+1 Garden Duplex)
Apt 14 (180-220 M² 3+1 Garden Duplex)
Apt 14 (250 M² 4+1 Garden Duplex)
Apt 42 (175-200 M² 3+1 penthouse)
Apt 28 (190-225 M² 4+1 penthouse)
L block 100 Flats:
Apt 48 (1+1 65-70 M²)
Apt 12 (2 + 1 100-115 M²)
Apt 16 (2+1 Garden Duplex 100-115 M²)
Apt 4 (3 + 1 Garden Duplex 175-200 M²)
Apt 16 (3+1 penthouse 160-185 M²)
Apt 4 (4+1 penthouse 200-250 M²)
Start of construction 20.10.2018
Completion of construction 31.12.2021